← Capability inventory · source 1ea8b8ea8b01

Cost and resource-governance source context

This reference preserves cross-cutting context for estimating, reserving and reconciling resources used by AI-intensive, processing-heavy, background, import and generation work. It does not define a billing product or adopt one credit currency.

Source roles and limits

SourceRoleCan establishCannot establish alone
Current PIOS framework and companion specificationsarchitecture and governance authorityexplicit approval for costly actions, token/resource budgets, cost-aware service selection, measured-cost requirements, and separation of architecture from deployment cost modelsone credit system, commercial pricing, billing behavior, or a shipped cost-control service
Historical PIOS Global at the selected revisionhistorical capability and interaction designestimate, approval, reservation, spend, partial completion, final accounting, standing preferences, budget modes, and cost-aware scope optionscurrent architecture authority, real monetary value, implementation availability, or transaction semantics
Restricted application evidence RAS-01requirements and bounded realization evidencetoken-budget fields and retrieval-budget requirements already assesseda generic cost-estimate, reservation, spend, accounting or budget-governance realization

Resource-governance stages

StageReusable treatment
Estimateindependent capability producing a bounded forecast
Approvalreuse governed proposal, execution policy, explicit owner request, action intent, or standing rule according to scope
Reservationindependent capability holding an internal allowance for one operation
Usage measurementreuse metric-observation recording or realization-specific metering
Partial completionpreserve in the underlying work/background-operation lifecycle
Final accountingindependent reconciliation capability over estimates, reservations, observations and completed scope
Billing/paymentseparate commercial domain outside this tranche

Cross-cutting boundaries

Documentation and realization reconciliation

The historical cost-governance model describes estimate, approval, reservation, spend, partial/full completion and final accounting as a product control loop. Applying the symmetric MLE test separates estimation, reservation and reconciliation. Approval, standing preferences, actual measurement and partial execution reuse existing proposal, policy, rule, metric and execution capabilities.

Current PIOS requires explicit approval for costly guarded actions, logs token budgets for retrieval, tracks real infrastructure cost before adding optional services, and keeps deployment cost choices outside the generic architecture. These principles support the reusable contracts but do not establish a universal credit system.

The selected restricted application documents token budgets for retrieval, but the bounded file-name and admitted-document review did not identify a generic cost-estimate, reservation, spend-accounting or budget-governance implementation. No tests, deployment or production behavior are claimed.

Canonical source ↗All capabilities