← CRD inventorySource 1ea8b8ea8b01
Capability Requirements Document · estimate-operation-resource-cost

Estimate operation resource cost

Produce an attributable forecast of the resources or internal cost units likely required for a bounded operation and scope.

Status
draft
Version
0.1
Architecture alignment
directly aligned with cost-aware governance
Adoption
proposed
Known public realizations
none confirmed
Evidence basis
no relevant restricted realization confirmed

Availability: unknown

Inventory note: An estimate is not approval, reservation, actual use, or billing.

Core meaning

Capability purpose
Give an owner or authorized policy evaluator enough cost information to choose whether and how deeply an operation should proceed.
Meaningful outcome
A current estimate identifies the operation, scope, unit, range or class, assumptions, method/version, uncertainty, validity window, and available lower-cost scope choices.
Boundaries — includes
operation and input scope, depth or effort class, estimated quantity or range, resource/cost unit, assumptions, uncertainty, estimate method/version, expiry, alternatives, and failure to estimate.
Boundaries — excludes
approving the operation, reserving capacity or credits, recording actual consumption, billing, payment, selecting a provider, and executing the operation.
Terms and concepts
An estimate may use a schema.org/QuantitativeValue or schema.org/MonetaryAmount where applicable. An internal credit is a comparison/control unit unless an adopted commercial profile gives it monetary meaning.

Interaction Contract MLEs

Estimate bounded operation cost

Actor
The owner, an authorized planner, policy evaluator, workflow, or agent preparing a cost-governed operation.
Command / intent
Estimate the likely resource cost for a declared operation and scope before execution.
Current state
The intended operation, input scope, depth/options, applicable unit, available estimating method, and relevant constraints can be determined.
Policies / invariants
The estimate remains distinct from approval, reservation, charge, and actual usage; uncertainty and assumptions are visible; false precision is avoided; alternative scopes do not become selected without a separate decision; materially stale estimates are not represented as current.
Transition
Evaluate the declared scope using the current method and produce a versioned range, class, or bounded quantity with assumptions and validity.
Result
A usable estimate, an explicit cannot-estimate result, or a requirement for additional scope information.
Events / effects
May inform a proposal, execution policy, budget reservation, scope reduction, deferral, or owner-attention item.
Unknowns
Universal units, confidence bands, expiry periods and acceptable estimation error are not established.

Rules and defaults

Rules / invariants

Unknown / unresolved

Statement provenance

StatementSemantic classEvidence statusSource / note
Cost estimation is a distinct pre-execution outcome that supports informed scope and approval decisions without granting execution authority.rule/invariantsourcedR01–R04.
Canonical source ↗All CRDs